![]() This spec shall be used on projects where specific tree removal must be done prior to the start date of the project under a separate tree contract. Consultants should not use this spec unless authorized by RCOC.įor use in the tree contract. This spec shall be used on projects where trees and clearing must be done prior to the start date of the project under a separate tree contract. This spec shall be used on projects where trees were previously removed as a precaution to protect Federally protected species. Include in every project in which the contractor will be removing vegetation as well as stumps. If your project is removing trees with diameter 8" or more this FUSP must be included.Ĭhanges clearing limits from MDOT's 10 ft to 3 ft beyond Slope Stake Line or ROW. This specification only has to do with Wood Disposal Agreements and Merchantable Timber. Use when requested by RCOC Design Department or RCOC Environmental Department. If you don't have money in these permits then use this special provision, but delete the pay item line. Use this special provision in lieu of the Notice to Bidders "permits and fees to be reimbursed for permit fees". Make sure review requirements for other items in the proposal are not less than 10 or 20 days. Can be used on bridges, culverts, roads, watermains, concrete, utilities, traffic signals, etc. Use on all projects requiring shop drawings for construction. Use on projects with work on CSX property. Work on railroad property-CSX Transportation, Inc. Updated language in 104.13 to include updates to the project inspection form submittal process. Use on all projects with custom face permanent signage. Requires the Contractor to provide shop drawings of all custom face layout permanent signage. ![]() Use when two projects under one contract are similar but separate special provisions for the project/Contract. Used to clarify information that is not clear to the contractor. Update utility companies and conflicts per project. This spreadsheet utilizes tables and can be filtered as needed. It is a tool to use with the Maintaining Traffic SP. It is a refined list of typicals RCOC would generally use with notes to help the user, including sign quantities. This spreadsheet was made from the Work Zone section of the Michigan Department of Transportation Traffic and Safety/Standards and Special Details. DocumentCenter/View/10372 /DocumentCenter/View/10372 /DocumentCenter/View/11325 /DocumentCenter/View/11386 20MOTĮntire document has been updated. For local let projects, rename file "ADMIN4_PCL". Road Commission for Oakland County FUSP template provided in Microsoft Word. This is a Word document of the SECS notes that should be put in the SECS sheets. Important: You must go through this entire documents and makes changes as appropriate to make it project specific. This is a Word document on General Notes that should be put in the General Plans. TTCP-110.01: Road Closure Non-Intersection TTCP-109.02: Reflectorized Markers Placement Detail TTCP-109.01: Advance Channelization and Protection for Barrier Flare Sections TTCP-108.01: Ramp Detail for Non-Working Hours ![]() TTCP-107.02.01: Sign Detail for Pedestrian Sidewalk By-Pass TTCP-107.01.02: Sign Detail for Temporary Sidewalk Closure TTCP-107.01.01: Sign Detail for Temporary Sidewalk Closure TTCP-105.07: Flagging Control at 3-Leg Intersection Far-Side Closure TTCP-105.06: Flagging Control at 3-Leg Intersection - 4 ![]() TTCP-105.05: Flagging Control at 3-Leg Intersection - 3 TTCP-105.04: Flagging Control at 3-Leg Intersection - 2 TTCP-105.03: Flagging Control at 3-Leg Intersection - 1 TTCP-105.02: Flagging Control at 4-Leg Intersection - 2 TTCP-105.01: Flagging Control at 4-Leg Intersection - 1 TTCP-104.01: Two-Way Left Turn Lane Closure TTCP-103.06: Moving Marking Operation - 2 TTCP-103.05: Left Lane Closure - Intersection Far Side TTCP-103.04: Left Lane Closure - Undivided TTCP-103.02: Right Lane Closure - Undivided TTCP-103.01: Right Lane Closure - Divided TTCP-102.06: Moving Marking Operation - 1 TTCP-102.04: Maintaining Two-Way Traffic while Working in Center of Roadway TTCP-102.03: Maintaining Two-Way Traffic by Encroaching into Opposing Traffic Flow TTCP-102.02: Flagging Control Non-Intersection TTCP-100.02: Portable Variable Message Sign Placement Traffic Control Preparation Guidelines and Requirements As requirements and drawings are revised, this page wil be updated appropriately. All pages and drawings are in PDF format. The most recent Montgomery County Work Zone Traffic Control Standards Book (July 2012) is available for download.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |